Horse Hollow Transmission “Miracle Project”
Abilene, TX – San Antonio, TX
  • Over 275 miles of OPGW splicing completed in 17 days
  • 113 splice locations of 48 count OPGW
  • Turnkey construction & installation of fiber optic repeater huts & SCADA system
  • Additional splicing at substations, repeater huts, and feeders
  • Bi-directional span testing & bi-directional end to end OTDR & power meter testing
  • Pre installation fiber optic reel testing



Synchronous Optical Network Upgrade OPGW installation
for El Paso Electric
El Paso, TX
  • 39 splice locations of 48 count OPGW
  • Termination of fiber optic cable in duct at 8 substations
  • Pre installation fiber optic reel testing
  • Bi-directional end to end OTDR and power meter testing



Ault to Cheyenne WAPA Transmission Project
Ault, CO – Cheyenne, WY
  • 28 splice locations of 24 count OPGW
  • Termination and splicing inside of substations
  • Pre installation fiber optic reel tests
  • Bi-directional end to end OTDR and power meter testing



Eerie to Hoyt WAPA Transmission Project
Eerie, CO – Hoyt, CO
  • 25 splice locations of 48 count OPGW
  • Termination and splicing in substations
  • Pre installation fiber optic reel tests
  • Bi-directional end to end OTDR and power meter testing



Buck to Julian Hinds Transmission Project
Blythe, CA
  • 23 Splice locations of 24 count OPGW
  • Termination and splicing in substations
  • Pre installation fiber optic reel tests
  • Bi-directional end to end OTDR and power meter testing